Parts, parts lists, work orders and finished goods in one Windows program on your own computer. Buy it once: $99 for up to 5 users, $199 for any number.
Turn your raw materials into finished products while managing every part. Spreadsheets (and your order books) won't be updated automatically as parts are used, meaning you can easily oversell without realizing. A bill of materials specifies exactly what components are needed to make a product, plus the quantity required for each part.
Parts list. In System 5 the parts list is on the assembly item. Bulk creation makes up to 200 new assemblies with the same parts list in one step, and the lines of a work order can become the parts list.
Work order. Production withdraws parts or subassemblies from stock to manufacture subassemblies or finished products. When you approve a work order, the parts go out of stock and the finished product comes in at the cost of its parts, with its location, serial numbers and expiry date.
No negative stock. If a part has less stock than the work order needs, the program refuses the work order.
The order must be placed some time before the stock becomes empty, or the production line stands idle, waiting for the key raw materials. The reorder report lists the parts below their minimum, and the overstock report lists the parts above their maximum. A purchase order goes to the vendor, and a receiving brings the parts in against it.
Keep track of single units and expiration dates with the serial number and expiry date fields. An item with serial numbers needs one number for each unit on the receiving and the sales lines. The expiry date is a date on the receiving line and on the serial number; System 5 does not keep a separate stock for each date.
No internet line is needed. Several computers on the local network use one database. Production scheduling, MRP planning and labour costs are not in System 5; Golden Inventory Web has production orders with yield and labour. Without a license file, System 5 runs as a demo: 50 records of each list and document type, with no time limit.
Yes. The parts list is on the assembly item. A work order reads it and takes each part out of stock; a part can also be an assembly that you made before.
The cost of its parts when the work order is approved. System 5 does not add labour or overhead.
The program refuses the work order. The reorder report shows which parts to buy, and a purchase order goes to the vendor.
The Small edition has 5 users, the Unlimited edition has no limit. A user is a login name; the number of computers does not matter.